Adum. Kumasi. Ashanti Region. Ghana

Trusted contractor for building and civil works.

Building construction, roads, drainage, and earthworks delivered from Adum, Kumasi, serving the Ashanti Region and Ghana with disciplined supervision and clean handover.

Project scoping
Fast response
Typical scope
Building, roads, drainage, earthworks, and maintenance.
Next step
Book a call. We clarify scope, timeline, site constraints, and the right execution plan.
Contractor Class
A2B2
Leadership
0+
years experience
Satisfied Clients
0+
completed engagements
Paths

How clients engage us

Clear entry points for owners, public sector teams, consultants, and careers.

Owners

Planning a build or upgrade? We guide scope and execution.

Public Sector

Roads, drainage, and civil works delivered to spec.

Consultants

Reliable delivery teams for design-led projects.

Careers

Join a safety-led construction team.

Case Studies

Featured experience and completed works

Selected assignments with public sector and infrastructure delivery focus.

Government Health Priority Project, AGENDA 111.
NMS INFRASTUCTURES | 2022 | Ongoing
Tuobodom District, Bono East, Techiman North.

• The work involves the construction of physiotherapy,Out patient department, reception, A & E, Administration, Pediatric A, Pediatric B, Public Health, etc. Construction of drains and culverts where applicable to solve drainage issues on site.

Construction of U-Drain at Hwereso, Kumasi (400m)
GHANA HIGHWAY AUTHORITY | 2018 | Completed
Asante-Akyem Agogo, Ashanti Region

• The work involves the construction of in-situ concrete 0.6m u-drain at designated location by the engineer.

Roadline Marking on Kumasi-Mampong Ejura road (18.0km)
GHANA HIGHWAY AUTHORITY | 2018 | Completed
Mampong Scarp-Ejura Highway, Ashanti Region

• The work involves the installation of thermoplastic line markings on the highway to improve safety on the roads. It also involves the installation of road furniture along the same stretch.

Pothole Patching and Shoulder Repair on Ejisu Kuntenase road (22.5km)
GHANA HIGHWAY AUTHORITY | 2018 | Ongoing
Ejisu Kuntenase Highway, Ashanti Region

• The work involves cutting of identified emerged and emerging potholes to regular shapes and patching with natural gravel, well compacted and repairing degraded shoulders as well. The compacted gravel is then patched with premixed bituminous material.

Pothole patching at Wesley College, Kumasi.
GHANA HIGHWAY AUTHORITY | 2017 | Completed
Suame, Kumasi, Ashanti Region

• The work involves cutting of identified emerged and emerging potholes to regular shapes and patching with natural gravel, well compacted and repairing degraded shoulders as well. The compacted gravel is then patched with premixed bituminous material.

Services

Construction delivery across building and civil works

We execute with disciplined site management. Clear scope, measurable milestones, and quality control you can verify.

Earthworks

Cut-and-fill with compaction control for stable formation and foundations.

Road Construction

Subgrade, base, drainage, and asphalt layers delivered to spec.

Building Construction

RC frame, blockwork, finishes, and handover documentation.

Construction of Bridges and Dams

Culverts, headwalls, and hydraulic structures with QA checks.

Complex Highway Projects

Patching, sealing, and line marking on high-traffic corridors.

Surveying

Setting out, levels, and as-builts for verified site control.

How We Work

Operational delivery flow

Practical steps that keep scope, time, and quality aligned.

Site assessment and constraints

Review access, utilities, and ground conditions early.

Method statements and programme

Align scope, sequencing, and time control.

QA hold points and HSE routine

Inspections, toolbox talks, and documented checks.

Handover and closeout documentation

As-builts, snag resolution, and completion records.

Ready to start

Let's scope your project properly

The fastest way to avoid delays is to align scope, constraints and timeline early. Book a call and we'll guide the next steps.